Home About Us Contact Us Exporting Global Sites Architects - Specifiers News - Updates
 

ampelair_transparent.gif 

 
  Overview
  • Technical
  • Installation
  • Product Range
  • Brochures
ampelair_industrial_ventilators_roofing.jpg 

 Ampelite Ampelair Industrial Roofing Ventilators

Technical Information

Vent Capacity Table

Extraction volume expressed as cubic metres per second.
1 cubic metre = 1000 litres

Stack Height Metres

Wind Speed Km/hr

Temp Diff °C

Model AA

500

600

800

 3.0

6

6

0.350

0.609

0.952

12

0.362

0.630

0.985

18

0.382

0.664

1.038

8

6

0.419

0.727

1.137

12

0.428

0.738

1.154

18

0.452

0.785

1.228

12

6

0.625

1.088

1.700

12

0.635

1.105

1.729

18

0.641

1.116

1.736

16

6

0.772

1.343

2.099

12

0.791

1.377

2.153

18

0.808

1.408

2.197

 6.0

6

6

0.362

0.630

0.985

12

0.420

0.732

1.145

18

0.431

0.751

1.175

8

6

0.424

0.738

1.154

12

0.439

0.763

1.194

18

0.458

0.797

1.246

12

6

0.635

1.105

1.729

12

0.655

1.141

1.784

18

0.713

1.239

1.937

16

6

0.791

1.377

2.153

12

0.813

1.414

2.211

18

0.844

1.467

2.294

9.0

6

6

0.381

0.664

1.038

12

0.431

0.751

1.175

18

0.483

0.839

1.312

8

6

0.452

0.785

1.228

12

0.458

0.797

1.246

18

0.530

0.922

1.441

12

6

0.642

1.116

1.745

12

0.712

1.239

1.937

18

0.737

1.283

2.007

16

6

0.808

1.408

2.197

12

0.843

1.467

2.294

18

0.855

1.486

2.324

How to Calculate the Number of Vents

ampelair_ventilator_area_covered.gif1. Determine the volume of the building.

  • Volume of section A = 0.5  x L x W x Ha
  • Volume of section B = L x W x Hb
  • Total building volume = volume of section A + volume of section B

NOTE: For factories, the combined volume A + B should be used.

Where Volume B is air-conditioned, only Volume A is used to calculate the number of ventilators required.  No air should be drawn from the air-conditioned space below ceiling level.
Using ventilators in the ceiling space of air-conditioned buildings reduces the load on the air-conditioning plant and helps reduce power consumption.

2. Select the number of ventilators required:

  • METRIC = V x A/ch
  • EX/c x 3.6
  • Where:  V = volume of building or roof space
    A/ch = Air changes per hour
  • EX/c = Exhaust capacity of ventilator

Consideration should be given to the space occupied by stored goods or machinery.  The adjustment to volume can reduce the number of vents required by up to 50%.

 acrobat_logo.jpgMore Information  

                                                         

      →Superflow Brochure

      

 

web1home_copy.jpg web2resi.jpg
web3spec_copy.jpg web4ind_copy.jpg 

 

© 2010 Ampelite NZ Ltd
79 Captain Springs Rd, Onehunga, Auckland, New Zealand • Tel (09) 634 5366

Website proudly supplied and supported by: www.simplygoodwebsites.co.nz